Tag Archives: repaired

PM Imran’s government corrects mistakes made in the past: CM Buzdar – Pakistan | Instant News


Published in 19 February 2021 11:05 am

Usman Buzdar said the outdated system only protects the elite class.

LAHORE (Dunya News) – Punjab Chief Minister Sardar Usman Buzdar Friday said the incumbent government was putting the country, which had been cut off due to the wrong policies of the former ruler, in the right direction and correcting mistakes made in the past under the leadership of the Prime. Minister Imran Khan.

Pakistani Tehreek-e-Insaf (PTI) officials summoned Sardar Usman Buzdar. CM said he resolved public issues by visiting all Punjab districts and took solid initiatives in this regard after consulting with representatives and party members.

Usman Buzdar said the outdated system only protects the elite class but the regime is working to change it to improve people’s lives.

.



image source

Karachi Traffic Police issues a revised diversion plan for the Test Match | Instant News


File image of a traffic police officer.

KARACHI: The Karachi Traffic Police on Saturday reissued diversion plans for the first Test match between South Africa and Pakistan.

The Trial Match will be played at the National Stadium in Karachi from January 26-30.

It is important to mention here that of the two Trial matches scheduled against South Africa, one will be played in Karachi, while the other will be in Rawalpindi.

During the Test match, some roads leading to the stadium will remain open to little traffic, according to a revised traffic plan issued on Saturday.

Here are the details:

Hassan Square flyover

From the Liaquatabad line via Hassan Square and University Road which turns towards Sir Shah Suleman Road, no vehicles are permitted to continue onto Stadium Road.


Traffic will be diverted from the flyover onto University Road. Likewise, the National Stadium flyover will remain closed to all traffic during the match.

Karsaz (Shahrah-e-Faisal)

All types of small vehicles will be allowed to drive on Jalan Habib Ibrahim Rehmatullah towards the stadium. Heavy / public transport will not be permitted.

Millennium Path (Rashid Mine)

Dalmia Road will remain open for small vehicles from the Millennium to the signal stadium. Heavy / public transport will not be permitted.

Chowrangi New Town (University Street)

The University Road / New Town Turn will remain open for small vehicles to signal the stadium. Heavy / public transport will not be permitted.

Traffic jam

Any kind of heavy traffic is not allowed to proceed from Sohrab Goth to NIPA, Liaquatabad No 10 to Hassan Square, PP Chowrangi to University Road, during the match.

.



image source

KWSB channel was damaged in Dhabeji | Instant News



The 72-inch Karachi Water and Sewerage Board (KWSB) water line that exploded at the Dhabeji Pump station two days ago due to a suspension of electricity supply by K-Electric (KE) was repaired on Thursday, a KWSB statement said.

According to a press statement from the water board, after a power failure, the 72-inch water channel cracked due to underdeveloped water pressure.

At the direction of the regional government minister Nasir Hussain Shah, work to begin repairing immediately, said a press statement.

Because of the repair work, 215 million gallons of water could not be supplied to the city on Thursday, he added.

According to the details distributed by the water board, the water line broke in the early hours of Wednesday around 2am. When the power supply is suspended, water flows backward under pressure where the waterline cracks at two different points, he said.

KWSB Managing Director Asadullah, at the direction of the minister, immediately ordered relevant officials to repair the channel, he said.

“The KWSB engineers arrived at the site early in the morning with heavy machinery and started repair work. The drains are drained, after which they are repaired. “

Electricity, according to a water council press statement, resumed after five and a half hours at around 8am, after which the water supply through other waterways continued to the city.

The MD water board, meanwhile, calls on the people of Karachi to use water with caution. “The water supply has now returned from the damaged lane too.” The water council press statement said it would take two to three days to fill the gap in supply, so residents must use water with caution.

KE version

In a press statement, KE said it continues to provide uninterrupted power supplies to all KWSB strategic locations, including pumping stations in Dhabeji, Gharo and Pipri. According to a spokesman for the EC, the power outage in Dhabeji was restored “on time and the electric utility maintenance and repair team was immediately mobilized for this”.

“In addition, the EC wants to reiterate that all the main water pump stations of the KWSB are freed from warehouses for the greater benefit of the Karachi community,” the statement added.

“Over the years, electricity utilities have also invested significantly in providing primary and backup feeder facilities available for Dhabeji pump stations. This also includes the addition / enhancement of Power Transformers at Dhabeji, Gharo, KDA (NEK) & RECP (Pipri) network stations.

In addition to ensuring a smooth power supply to all KWSB strategic installations, KE also extends all possible technical support and maintains close coordination with the KWSB team at all times. “

.



image source

Sewerage in Club Road repaired | Instant News


The main wastewater disposal channel of the Karachi Water and Waste Disposal Council (KWSB) on Club Road in Karachi’s red zone that surrounds the Governor’s House and the Metropole Hotel has collapsed again a few days ago when the lock was repaired on Sunday, said a statement issued. by water boards.

KWSB said the 24-inch diameter sewerage line had been repaired in a short amount of time. In addition, a 54 inch diameter sewer in Liaquatabad has also been repaired. Sewage has become operational, the statement added. In the early hours of Sunday, the water board began the repair work.

KWSB Superintendent Engineer Aftab Chandio told The News that the channel was damaged a few days ago during locking, but they did not have permission to repair it. The broken line, he explained, came from inside the Governor’s House and fell on the 54-inch diameter line towards PIDC.

.



image source